See how three customers use Vantor Robotics autonomous mobile robots in their warehouses today.
82%
Fewer line stoppages from missing parts (electronics contract manufacturer)
310
Picks per hour per person, up from 95 (online fashion retailer)
35%
Lower peak-season staffing need (online fashion retailer)
45
VT-30 robots bringing totes to 12 picking stations
22
VT-600 robots delivering parts carts to 9 lines
8hours
On-site service response time
| Flexible navigation | Vantor autonomous mobile robots (AMRs) move totes and pallets inside warehouses. They work next to people without fixed tracks or floor tape. |
|---|---|
| One software for the whole fleet | All robots run on Vantor Fleet, which assigns tasks, plans routes and connects to the warehouse management system. |
| Awareness around people | 360° lidar and 3D cameras let robots slow down near people and stop at 0.3 m. |
| Product | Description | Specifications |
|---|---|---|
| VT-30 | Goods-to-person picking robot for totes. |
|
| VT-600 | Moves carts between zones. |
|
| VP-1500 | Pallet moves from dock to rack. |
|
Certification
ISO 3691-4
Sensing
360° lidar and 3D cameras
Safety behavior
Slows down near people and stops at 0.3 m
Fleet software
Vantor Fleet assigns tasks, plans routes and connects to the warehouse management system
| Item | VT-30 | VT-600 | VP-1500 |
|---|---|---|---|
| Payload | 30 kg tote | 600 kg cart | 1,500 kg pallet |
| Speed | 1.8 m/s | 1.5 m/s | 1.2 m/s |
| Battery | 10 h, 1 h charge | 9 h, swappable | 8 h, auto-charge |
| Use | Goods-to-person picking | Moving carts between zones | Pallet moves dock to rack |
Vantor robots are certified to this standard
| 6.1Online fashion retailer | 14,000 orders per day and pickers walking 16 km per shift. 45 VT-30 robots bring totes to 12 picking stations. Picks per hour rose from 95 to 310 per person, walking per shift fell to under 2 km, and peak-season staffing need was cut by 35%. |
|---|---|
| 6.2Auto parts distributor | Forklift traffic in narrow aisles caused near-misses every week. 18 VP-1500 robots took over pallet moves from the dock to the racks. The robot zone saw zero forklift incidents over 14 months, and dock-to-stock time fell from 6 hours to 2.5 hours. |
| 6.3Electronics contract manufacturer | Line-side parts arrived late and stopped assembly lines. 22 VT-600 robots deliver parts carts from the store to 9 lines on a fixed schedule. Line stoppages from missing parts are down 82%, and four material handlers moved to quality inspection. |
Start with a site survey and simulation. Ask for one through the contact form to see how Vantor robots fit your operation.
Ask for a site survey and simulation through the contact form.
Rollout starts with a site survey and simulation with your order data (2 weeks), followed by a pilot with 5–10 robots in one zone (4 weeks). Full rollout then runs zone by zone without stopping operations.
After go-live, Vantor Robotics provides 24/7 remote monitoring and on-site service within 8 hours.