See how three customers use Stavrin Robotics autonomous mobile robots in their warehouses today.
Stavrin Robotics builds autonomous mobile robots (AMRs) that move totes and pallets inside warehouses, working next to people without fixed tracks or floor tape. This document shows how three customers use Stavrin robots today.
82%
Fewer line stoppages from missing parts (electronics contract manufacturer)
310
Picks per hour per person, up from 95 (online fashion retailer)
35%
Lower peak-season staffing need (online fashion retailer)
45
VT-30 robots bringing totes to 12 picking stations
22
VT-600 robots delivering parts carts to 9 lines
8
On-site service response time
| Flexible navigation | Stavrin autonomous mobile robots (AMRs) move totes and pallets inside warehouses. They work next to people without fixed tracks or floor tape. |
|---|---|
| One software for the whole fleet | All robots run on Stavrin Fleet, which assigns tasks, plans routes and connects to the warehouse management system. |
| Awareness around people | 360° lidar and 3D cameras let robots slow down near people and stop at 0.3 m. |
| Product | Description | Specifications |
|---|---|---|
| VT-30 | Goods-to-person picking robot for totes. |
|
| VT-600 | Moves carts between zones. |
|
| VP-1500 | Pallet moves from dock to rack. |
|
Certification
ISO 3691-4
Sensing
360° lidar and 3D cameras
Safety behavior
Slows down near people and stops at 0.3 m
Fleet software
Stavrin Fleet assigns tasks, plans routes and connects to the warehouse management system
| Item | VT-30 | VT-600 | VP-1500 |
|---|---|---|---|
| Payload | 30 kg tote | 600 kg cart | 1,500 kg pallet |
| Speed | 1.8 m/s | 1.5 m/s | 1.2 m/s |
| Battery | 10 h, 1 h charge | 9 h, swappable | 8 h, auto-charge |
| Use | Goods-to-person picking | Moving carts between zones | Pallet moves dock to rack |
Stavrin robots are certified to this standard
| 6.1Online fashion retailer | 14,000 orders per day and pickers walking 16 km per shift. 45 VT-30 robots bring totes to 12 picking stations. Picks per hour rose from 95 to 310 per person, walking per shift fell to under 2 km, and peak-season staffing need was cut by 35%. |
|---|---|
| 6.2Auto parts distributor | Forklift traffic in narrow aisles caused near-misses every week. 18 VP-1500 robots took over pallet moves from the dock to the racks. The robot zone saw zero forklift incidents over 14 months, and dock-to-stock time fell from 6 hours to 2.5 hours. |
| 6.3Electronics contract manufacturer | Line-side parts arrived late and stopped assembly lines. 22 VT-600 robots deliver parts carts from the store to 9 lines on a fixed schedule. Line stoppages from missing parts are down 82%, and four material handlers moved to quality inspection. |
Start with a site survey and simulation. Ask for one through the contact form to see how Stavrin robots fit your operation.
Ask for a site survey and simulation through the contact form.
Rollout starts with a site survey and simulation with your order data (2 weeks), followed by a pilot with 5–10 robots in one zone (4 weeks). Full rollout then runs zone by zone without stopping operations.
After go-live, Stavrin Robotics provides 24/7 remote monitoring and on-site service within 8 hours.